GE General Electric Computer Monitor LTC-MAP 2130 Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Elektronika samochodowa GE General Electric Computer Monitor LTC-MAP 2130. GE General Electric Computer Monitor LTC-MAP 2130 User's Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 68
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
GE Energy Management
Part No. 70055MP
Rev. D, February 3, 2000
Maintenance Action Planner
TM
LTC-MAP 2130 Monitor
Product Manual
Przeglądanie stron 0
1 2 3 4 5 6 ... 67 68

Podsumowanie treści

Strona 1 - Product Manual

GE Energy Management Part No. 70055MP

Strona 2

Section 1: Introduction 1-5 70055MP Revision D February 3, 2000 Electrical Sensor Power Supply 24 VDC @ 0.65A. Power Input Protection Fused (F1) Ty

Strona 3 - Revision History

1-6 Section 1: Introduction February 3, 2000 70055MP Revision D Available Options Available options for the LTC-MAP 2130 are listed in Table 1-1.

Strona 4 - Table of Contents

Section 1: Introduction 1-7 70055MP Revision D February 3, 2000 Typical Application A transformer utilizing an LTC-MAP 2130 monitor is illustrated

Strona 5

1-8 Section 1: Introduction February 3, 2000 70055MP Revision D A typical system may include several monitors, one for each transformer at the site

Strona 6 - Section 1: Introduction

Section 1: Introduction 1-9 70055MP Revision D February 3, 2000 Manual Conventions This manual provides the information you will need to install, o

Strona 7

70055MP Revision D February 3, 2000 Section 2: Getting Started Receiving Inspection On receipt of the LTC-MAP 2130 Monitor: 1. Carefully inspect th

Strona 8 - Specifications

2-2 Section 2: Getting Started February 3, 2000 70055MP Revision D Front Cover Layout There are three indicator lights on the front cover of the L

Strona 9 - General

Section 2: Getting Started 2-3 70055MP Revision D February 3, 2000 Face Panel Layout The face panel is accessed by releasing the fasteners on the ri

Strona 10 - Physical Enclosure

2-4 Section 2: Getting Started February 3, 2000 70055MP Revision D Operating Conditions Button The Operating Conditions button is located directly

Strona 11 - Available Options

Section 2: Getting Started 2-5 70055MP Revision D February 3, 2000 LCD Display The LCD is a 20 character by 4 line display (Figure 2-3). It display

Strona 12 - Typical Application

GE Energy Management 70055MP Revision D February 3, 2000 LTC-MAP 2130 Monitor Maintenance Action Planne

Strona 13 - Figure 1-3: Typical System

2-6 Section 2: Getting Started February 3, 2000 70055MP Revision D Circuit Board Location The CPU and I/O circuit boards are accessed by loosening

Strona 14 - Manual Conventions

Section 2: Getting Started 2-7 70055MP Revision D February 3, 2000 I/O Board The I/O Circuit board (Figure 2-5) contains sensor signal conditioning

Strona 15 - Section 2: Getting Started

2-8 Section 2: Getting Started February 3, 2000 70055MP Revision D Power Supply Board The Power Supply circuit board (Figure 2-6) contains the low

Strona 16 - Front Cover Layout

Section 2: Getting Started 2-9 70055MP Revision D February 3, 2000 CPU Board The CPU circuit board (Figure 2-7) contains the microprocessor (CPU), L

Strona 17 - Face Panel Layout

2-10 Section 2: Getting Started February 3, 2000 70055MP Revision D Communications The SAGE host software installed on a personal computer allows

Strona 18 - Acknowledge Alarm Button

70055MP Revision D February 3, 2000 Section 3: Installation This Section includes procedures for installation, configuration, wiring, setting up co

Strona 19 - < <

3-2 Section 3: Installation February 3, 2000 70055MP Revision D Mounting the Monitor Secure the monitor to the selected location using four ¼-20#

Strona 20 - Circuit Board Location

Section 3: Installation 3-3 70055MP Revision D February 3, 2000 Cable Installation After securely mounting the LTC-MAP 2130 monitor, route the inpu

Strona 21 - I/O Board

3-4 Section 3: Installation February 3, 2000 70055MP Revision D I/O Board Configuration Jumpers The I/O board configuration jumpers allow you to c

Strona 22 - Power Supply Board

Section 3: Installation 3-5 70055MP Revision D February 3, 2000 Table 3-1: Channel Configuration Jumpers and Positions Jumper Position Selected

Strona 23 - CPU Board

February 3, 2000 ii 70055MP Revision D Copyright Information Copyright  2000 Reuter-Stokes, Inc. All rights reserved. This manual may not, in wh

Strona 24 - Communications

3-6 Section 3: Installation February 3, 2000 70055MP Revision D Alarm Configuration Jumpers Jumpers JP18 and JP19 set the annunciator relay output

Strona 25 - Section 3: Installation

Section 3: Installation 3-7 70055MP Revision D February 3, 2000 Wiring Overview Prior to starting any wiring procedures: Pull the power fuse (F1) o

Strona 26

3-8 Section 3: Installation February 3, 2000 70055MP Revision D K4Q10J19R113R112R111Q9K1J15J14 J16J136V9V17CHANNEL1 16 141715 13 12 11 10 9BAABCBA

Strona 27 - Cable Installation

Section 3: Installation 3-9 70055MP Revision D February 3, 2000 Figure 3-5: Example of a Typical Wiring Diagram for the LTC-MAP 2130

Strona 28 - Channel Configuration

3-10 Section 3: Installation February 3, 2000 70055MP Revision D Wiring the Sensors Refer to Table 1-1 for a list of sensors available for use wit

Strona 29

Section 3: Installation 3-11 70055MP Revision D February 3, 2000 Wiring a Tap Position Indicator OEM Potentiometers The OEM potentiometer is a volt

Strona 30 - Ground Jumpers

3-12 Section 3: Installation February 3, 2000 70055MP Revision D 0 to +5 VDC or 0 to +10 VDC Power Connect the OEM potentiometer to the LTC-MAP Ci

Strona 31 - Overview

Section 3: Installation 3-13 70055MP Revision D February 3, 2000 -5 to +5 VDC or -10 to +10 VDC Power Connect the OEM potentiometer to the LTC-MAP

Strona 32 - J.W.HARLEY INC

3-14 Section 3: Installation February 3, 2000 70055MP Revision D LTC-MAP Power OEM potentiometers that are not powered require power from the LTC-

Strona 33 - Section 3: Installation 3-9

Section 3: Installation 3-15 70055MP Revision D February 3, 2000 3. Calculate the Voltage Drop Resistor value (Rd): Rd = Rs x 1.4. 4. Select a vo

Strona 34 - Wiring the Sensors

70055MP Revision D iii February 3, 2000 Table of Contents Section 1: Introduction Product Overview...

Strona 35 - OEM Potentiometers

3-16 Section 3: Installation February 3, 2000 70055MP Revision D After-Market Use the following procedure to wire an After-Market Tap Position In

Strona 36

Section 3: Installation 3-17 70055MP Revision D February 3, 2000 Wiring the AC Voltage Inputs Connect voltage signals to the designated terminals (

Strona 37

3-18 Section 3: Installation February 3, 2000 70055MP Revision D Wiring the Annunciator Outputs Wire the alarms by connecting the alarm activation

Strona 38 - LTC-MAP Power

Section 3: Installation 3-19 70055MP Revision D February 3, 2000 Wiring the Internal Heater The monitor’s internal heater requires 110 VAC power in

Strona 39

3-20 Section 3: Installation February 3, 2000 70055MP Revision D Establishing Communications The SAGE host software installed on a personal compu

Strona 40 - After-Market

Section 3: Installation 3-21 70055MP Revision D February 3, 2000 Serial Port Communications To establish communications via the front panel serial

Strona 41 - Wiring the Digital Inputs

3-22 Section 3: Installation February 3, 2000 70055MP Revision D Modem Communications To establish communications via a modem: 1. If not already

Strona 42

Section 3: Installation 3-23 70055MP Revision D February 3, 2000 Initial Start Up 1. Before applying power to the system, verify that: • All sens

Strona 43 - Wiring Power

3-24 Section 3: Installation February 3, 2000 70055MP Revision D Once power is applied, and configuration parameters have been uploaded to the mo

Strona 44 - Establishing Communications

70055MP Revision D February 3, 2000 Section 4: Operation Overview Once power is applied, the LTC-MAP starts monitoring sensor, voltage, current, and

Strona 45 - Serial Port Communications

February 3, 2000 iv 70055MP Revision D Establishing Communications...

Strona 46 - Modem Communications

4-2 Section 4: Operation February 3, 2000 70055MP Revision D Analog Channel Readings Screens The Analog Channel Readings screens display up to four

Strona 47 - Initial Start Up

Section 4: Operation 4-3 70055MP Revision D February 3, 2000 Tap Change Summary Screen The Tap Change Summary screen (Figure 4-3) displays: • Tap

Strona 48 - Calibrate Tap Position

4-4 Section 4: Operation February 3, 2000 70055MP Revision D Alarm Status & Settings Button Alarm Status & Settings screens are accessed by

Strona 49 - Section 4: Operation

Section 4: Operation 4-5 70055MP Revision D February 3, 2000 Current Time and Date Screen The Current Time and Current Date screen (Figure 4-6) dis

Strona 50 -  configuration file

70055MP Revision D February 3, 2000 Section 5: Troubleshooting Procedures Refer to Table 5-1 for common troubleshooting procedures. Table 5-1: Commo

Strona 51 - Tap Change Summary Screen

5-2 Section 5: Troubleshooting Procedures February 3, 2000 70055MP Revision D Table 5-1: Common Troubleshooting Procedures (Cont’d) Condition Poss

Strona 52 - LTC-MAP Status Screen

70055MP Revision D February 3, 2000 Appendix A: User-Specific Information Forms Use the Analog Channel Configuration form to document LTC-MAP 2130 c

Strona 53 - Acknowledging Alarms

A-2 Appendix A: User-Specific Information Forms February 3, 2000 70055MP Revision D Tap Position Calibration Low Point High Point

Strona 54

Appendix A: User-Specific Information Forms A-3 70055MP Revision D February 3, 2000 LTC-MAP 2130 Customer Installation Information (Part 1)

Strona 55

A-4 Appendix A: User-Specific Information Forms February 3, 2000 70055MP Revision D LTC-MAP 2130 Customer Installation Information (Part 2)

Strona 56 - Analog Channel Configuration

70055MP Revision D February 3, 2000 Section 1: Introduction Product Overview The LTC-MAP 2130 Monitor (Figure 1-1) is an on-line maintenance action

Strona 57 - Low Point High Point

Appendix A: User-Specific Information Forms A-5 70055MP Revision D February 3, 2000 LTC-MAP 2130 Customer Installation Information (Part 3)

Strona 58

70055MP Revision D February 3, 2000 Appendix B: Firmware Upgrades Use the following procedure to replace the EPROM for firmware upgrades: NOTE: Be s

Strona 59

B-2 Appendix B: Firmware Upgrades February 3, 2000 70055MP Revision D 9. Using a 3/16” slotted screwdriver, carefully remove the existing EPROM. N

Strona 60

Appendix B: Firmware Upgrades B-3 70055MP Revision D February 3, 2000 16. Re-install the hardware that secures the CPU board to the face panel. 17.

Strona 61

70055MP Revision D February 3, 2000 Appendix C: Glossary of Terms A Amperes. Alarm Operating condition occurring when data point value exceeds the

Strona 62

70055MP Revision D February 3, 2000 Index A Acknowledge Alarm button, 1-4, 2-3, 3-4, 3-6, 4-6 alarm activation signal, 3-18 alarm configuration, 3-

Strona 63

I-2 Index February 3, 2000 70055MP Revision D F face panel, 2-2, 2-3, 2-4, 2-9, 4-6 front cover, 2-2, 2-3 front panel controls, 1-4 front panel disp

Strona 64

Index I-3 70055MP Revision D February 3, 2000 S SAGE, 1-6, 3-20, 4-2 sensor input connections, 3-10 sensor inputs, 3-4, 3-5 sensors, 3-7, 3-10, 3-23

Strona 65

GE Energy Management FFOORR SSAALLEESS,, SSEERRVVIICCEE,, AANNDD TTEECCHHNNIICCAALL SSUUPPPPOORRTT C

Strona 66

1-2 Section 1: Introduction February 3, 2000 70055MP Revision D LTC-MAP 2130 Monitor is a multi-input data storage and analysis system. Each syste

Strona 67

Section 1: Introduction 1-3 70055MP Revision D February 3, 2000 Specifications Input Analog Seventeen (17) channels. Channels 1 - 7 Input: 4 to 20

Strona 68

1-4 Section 1: Introduction February 3, 2000 70055MP Revision D General Relay Outputs Two dry-contact relay outputs for alarm indication. Front Pan

Komentarze do niniejszej Instrukcji

Brak uwag